How the Building Permit Process Works

The residential building permit process can involve project review, permit drawings, municipal submission, plan examination, review comments and inspections. This page explains the typical sequence and where requirements can vary.

Ontario residential house representing the building permit process
One Coordinated Permit Journey
Property Review Permit Drawings Engineering Submission Support
Clear Project Scope
Project-Specific Drawings
Technical Coordination
Municipal Review Support
Starting Your Permit Review

Begin With the Information You Already Have

You do not need a complete design before contacting us. A clear description of the proposed work and the available property information are enough to begin the initial review.

  • Property address
  • Project description
  • Photos of the existing area
  • Property survey, when available
  • Existing drawings or plans
  • Sketches or inspiration
  • Municipal correspondence
  • Known project constraints
The Permit Journey

Seven Steps in the Residential Building Permit Process

The exact requirements vary by project and municipality, but most residential permit applications follow this general path.

1

Initial Project Review

We learn what you are planning, review the available documents and identify the general permit scope.

2

Property & Zoning Review

Relevant setbacks, lot coverage, building height, use, parking and property constraints are reviewed.

3

Existing-Condition Documentation

Measurements, photographs, survey information and relevant existing construction are documented.

4

Design & Permit Drawings

Scaled, dimensioned and coordinated drawings are prepared for the proposed residential work.

5

Engineering & Specialist Coordination

Structural, mechanical, plumbing, energy, grading or other supporting information is coordinated where required.

6

Application & Municipal Submission

Required forms, drawings and supporting documents are organized for municipal submission. Applicable municipal fees are paid as required by the reviewing authority.

7

Review Comments & Permit Decision

The municipality reviews the proposed work for Building Code compliance and applicable law, which can include local zoning requirements, before a permit decision.

Application Readiness

What Makes a Permit Application Complete?

The required package depends on the municipality and project. A complete application generally includes the current forms, coordinated drawings, supporting information and required fees.

01

Required Forms

  • Current application forms
  • Owner or authorized-agent signatures
  • Applicable declarations
  • Project-specific municipal forms
02

Permit Drawings

  • Site information
  • Floor plans
  • Elevations and sections
  • Construction details
  • Professional information where required
03

Supporting Information

  • Zoning or applicable-law documentation
  • Structural engineering
  • Energy or mechanical information
  • Project-specific reports
  • Required permit fees
Municipal completeness rules and review streams can change. The current application guide and forms for the project should always be confirmed before submission.
Municipal Plan Examination

What Happens During Municipal Review?

The municipality examines the application according to the project type and applicable review requirements.

01

Zoning Review

Land use, building placement, setbacks, height, parking and other zoning requirements are examined.

02

Building Code Review

Plans are examined for applicable Ontario Building Code requirements.

03

Specialist Review

Mechanical, plumbing, drainage or other specialist reviews may apply depending on the project.

04

Decision

The municipality may approve the application, request revisions or identify outstanding requirements.

Review Comments

What Happens if the Municipality Requests Revisions?

Review comments are a normal part of many permit applications. They may request clarification, additional information or changes to the submitted drawings.

  • Comments related to our scope are reviewed
  • Required clarifications or revisions are coordinated
  • Updated drawings are prepared for resubmission
  • Major scope changes may require additional services
After Permit Issuance

Approved Documents Must Guide Construction

Construction must follow the issued permit and approved drawings. Required inspections must be requested at the appropriate stages.

  • Keep approved permit documents available on site
  • Build according to the approved drawings
  • Book required municipal inspections
  • Coordinate changes before covering the work
  • Submit revisions when permit changes are required
Avoidable Permit Delays

What Can Slow Down a Permit Application?

Incomplete Drawings

Missing dimensions, details or uncoordinated plans can create review questions.

Missing Forms

Outdated, unsigned or incomplete application forms can hold up intake.

Zoning Issues

Setback, height, parking or use issues may require additional review or approvals.

Outstanding Applicable Law

Heritage, conservation, planning or other approvals may need to be resolved.

Uncoordinated Engineering

Structural and architectural information must agree across the permit package.

Design Changes During Review

Major changes can require new drawings, specialist updates and additional review.

Why Building Permit Group?

A Clear, Coordinated Permit Process

01

Defined Scope Before Drafting

We identify the project information and professional coordination expected before drawings progress.

02

Property-Based Documentation

Permit information is prepared around the existing property conditions and the proposed residential work.

03

Coordinated Professional Information

Where required, supporting architectural and specialist information is coordinated within the agreed project scope.

04

Response to Drawing Comments

Comments related to our scope can be reviewed and reflected in updated permit documents for resubmission.

Frequently Asked Questions

Building Permit Process Questions

Answers to common questions about drawings, submission, municipal review and permit issuance.

How long does the building permit process take?
Timelines vary by municipality, project type, application completeness, outside approvals and the number of review comments.
Can you confirm whether my project needs a permit?
We can review the proposed work and available information to help identify the likely permit path. The municipality has final authority.
Do I need a property survey?
A current survey or other reliable site information may be needed when property lines, setbacks or existing site conditions must be established. Requirements vary by project and municipality.
When is structural engineering required?
Engineering may be required for beams, posts, foundations, underpinning, retaining walls, large openings and other structural work.
Can Building Permit Group assist with submission?
We can prepare and organize the permit package, assist with submission and respond to comments related to the services in our scope.
What happens if the municipality requests revisions?
We review applicable comments, coordinate required clarifications or drawing revisions and prepare updated documents for resubmission.