Additional Residential Units Ontario | ARU Permit Drawings | BPG
Ontario ARU Permit Planning

Additional Residential Units

An additional residential unit can create independent living space within your home or, where permitted, in a detached building on the same property. Before construction begins, the property, zoning, proposed layout and permit requirements should be reviewed together.

What an ARU can be

One housing idea, several possible configurations

The correct route depends on where the new dwelling will be located and how many units already exist on the lot.

Basement additional residential unit01

Basement Unit

A self-contained dwelling created within the basement, with its own living, sleeping, kitchen and bathroom facilities.

Interior second residential unit02

Interior Second Unit

A separate dwelling arranged within another part of the principal house rather than exclusively below grade.

Third residential unit within a house03

Third Unit in the House

On qualifying properties, the main dwelling may contain three residential units under the provincial ARU framework.

Detached additional residential unit04

Detached ARU

A residential unit in an ancillary building may be possible when the main house and lot configuration satisfy the applicable rules.

Why homeowners add units

Use existing residential land more effectively

Independent family living space

Independent family space

Create a separate home for adult children, parents or extended family while keeping households on the same property.

Long-term rental housing unit

Long-term rental housing

A code-compliant unit can add housing supply and may create rental-income potential, subject to local rental rules.

Adaptable residential living space

Adaptable property use

A carefully planned unit can support changing household needs without requiring the homeowner to leave the neighbourhood.

What's included

From property review to permit-ready drawings

The drawing package should describe the actual proposed construction clearly enough for municipal review and contractor pricing.

The exact submission list varies with the municipality, building condition and scope. Engineering or other specialist documents are added when the project requires them.

Typical project scope

Property and zoning review before the layout is finalized
Existing and proposed floor plans with dimensions and room uses
Building sections and construction details where required
Door, window, exit and spatial information relevant to the design
Permit forms and drawing coordination for the municipal submission
Coordination with structural engineering when structural work is proposed

Planning considerations

What can affect an ARU before permit submission?

Provincial permission is only part of the review. The design must also respond to the property's physical conditions and applicable municipal rules.

Residential property showing unit locations

Number and location of units

The permitted arrangement depends on the principal dwelling, any existing units and whether an ancillary building contains residential space.

Setbacks and building height considerations

Setbacks and building height

Detached-unit designs can still be affected by local setback and height provisions even where the residential use itself is permitted.

Lot coverage and floor area planning

Lot coverage and floor area

Provincial ARU regulations address certain lot-coverage, FSI and minimum-lot-area barriers, while local provisions may permit more.

Additional residential unit entrance and exit

Entrances and exiting

The location and construction of entrances, exits and escape routes must be coordinated with zoning and building-safety requirements.

Residential water and servicing

Water and servicing

Added kitchens, bathrooms and occupants can affect plumbing, drainage and water-distribution design. Site-specific servicing must be checked.

Residential property with site constraints

Conservation and site constraints

Regulated lands, trees, easements, heritage conditions or other applicable law can introduce approvals outside the standard building-permit review.

Our process

A permit path built around the actual property

Step 1

Property Review

Confirm the existing house, lot conditions, known approvals and proposed unit strategy.

Step 2

Zoning Check

Review the applicable municipal provisions before committing to a final layout.

Step 3

Design Development

Plan the unit around usable space, circulation, exits, services and required construction.

Step 4

Permit Package

Prepare the drawings and coordinate supporting documents required for submission.

Step 5

Municipal Review

Respond to permit-review comments that relate to the prepared design and drawing package.

Why Building Permit Group

Permit design that starts with feasibility

An ARU is not simply a basement layout. The project combines land-use permissions, existing-building conditions and permit documentation.

What we focus on first

1Whether the proposed unit arrangement fits the property and current local rules
2What must change in the existing building to support a permit application
3Which drawings and outside disciplines are actually relevant to the project
4How to present the proposed work clearly for municipal review

Municipal coverage

ARU rules are not identical across the GTA

Ontario establishes the provincial framework, but municipalities can have different terminology, zoning permissions, registration programs and permit procedures.

Toronto

Toronto provides separate permit guidance for secondary suites, multiplex conversions, garden suites and laneway suites. Buildings with multiple independent units may fall under multiplex rules.

Mississauga

Mississauga zoning permits specified combinations of attached and detached ARUs in eligible zones. Current zoning must be checked against the individual property.

Brampton

Brampton has an ARU registration program and specific rules for attached units and garden suites. Rental licensing requirements can also apply.

Vaughan

Vaughan requires homeowners creating or upgrading secondary suites or ADUs to address zoning, building permits and required construction inspections.

Oakville

Oakville zoning permits specified attached and detached additional-unit combinations. Current zoning and any property-specific provisions still require review.

Markham & York Region

Markham's ARU framework has been evolving. Property-specific permissions should be verified against the zoning in force when the project is planned.

Official Ontario Resources

Current Provincial Rules for Additional Residential Units

For provincial requirements, review the Ontario Planning Act and O. Reg. 462/24 — Additional Residential Units. Municipal zoning, permit procedures and property-specific requirements still need to be checked with the municipality where the property is located.

Find out what your property can support before you renovate

Send us your property address and the type of unit you are considering. We can begin with the zoning and permit questions that shape the project.

Homeowner questions

Additional Residential Unit FAQ

What is an additional residential unit?

An ARU is a self-contained dwelling added to a residential property. Depending on the property and local rules, it may be inside the main house or in a permitted detached accessory building.

How many residential units can I have on my property in Ontario?

Provincial Planning Act permissions generally protect up to three residential units on qualifying urban residential land in specified configurations. Some municipalities permit more units in certain areas, so current local zoning must also be checked.

Do I need a building permit for an additional residential unit?

Creating a new dwelling unit normally requires a building permit. The municipality reviews the proposed construction for Ontario Building Code compliance and applicable law.

Can an additional residential unit be in my basement?

Yes. An attached ARU may often be created in a basement when the property, design and construction can satisfy applicable zoning and building requirements.

Can I build a detached additional residential unit?

A detached unit may be possible on qualifying properties. Local setbacks, height, access, servicing, trees, conservation lands and other site conditions still need review.

What if my proposed ARU does not comply with zoning?

The design may need revision. Depending on the specific zoning issue, a planning approval such as a minor variance may be considered, but approval is not automatic.

Do ARU rules differ between GTA municipalities?

Yes. Provincial legislation establishes a framework, while municipalities apply local zoning, permit procedures and other requirements. Some municipalities also permit more units than the provincial baseline.

Can I convert my garage into an additional residential unit?

A garage conversion may be possible where the proposed dwelling and property comply with applicable zoning, building, structural, fire, plumbing and other requirements.

Do I need separate plumbing or mechanical permits?

Related plumbing, drain, HVAC or other permits may be required depending on the municipality and scope. These requirements are confirmed during permit planning.

Does an existing illegal basement apartment become legal automatically?

No. Existing unapproved units should be reviewed against applicable zoning, building and fire requirements and the municipality's legalization or registration process where applicable.