Residential Accessory Structures

Accessory Structure Permit Drawings

Accessory structure permits for sheds, cabanas, detached garages, workshops and similar backyard structures depend on the project and property. Building Permit Group prepares property-specific drawings and coordinates the municipal permit steps that apply to the proposed structure.

Property-Specific Zoning ReviewLocation, setbacks, height and coverage
Permit Drawing PackagesPlans, elevations, sections and details
Municipal CoordinationRequirements checked for the property location
Clear Permit PathKnow what applies before construction begins
Start With the Right Permit Question

Accessory Structure Rules Depend on What You Are Building — Not Just Its Size.

A small detached storage shed can qualify for an Ontario Building Code permit exemption when all exemption conditions are met. That does not mean every small backyard structure is permit-free.

Detached garages, workshops, pool houses, cabanas and other structures can follow different permit rules. Attachment to another building, plumbing and the proposed use can also change the permit analysis.

Zoning review remains important even when a building permit is not required. Municipal rules can still regulate where the structure may sit and how large or tall it may be.

Common Residential Projects

Accessory Structures Homeowners Commonly Add to a Property

The municipal definition and requirements can vary. These examples show common project types that should be reviewed individually before construction.

Accessory structure permit project for a detached backyard storage shed

Storage Sheds

Detached structures used for household or yard storage, including projects that may qualify for the specific Ontario shed exemption.

Accessory structure permit drawings for a detached residential garage

Detached Garages

Separate vehicle-storage buildings where zoning, driveway access, setbacks, structural design and parking requirements can all matter.

Accessory structure permit project for a backyard cabana and pool house

Cabanas & Pool Houses

Backyard structures associated with a pool or outdoor living area, sometimes including plumbing, washroom or change-room functions.

Accessory structure permit drawings for a detached residential workshop

Workshops

Detached hobby or work buildings that should be reviewed for proposed use, size, servicing, construction and zoning compliance.

Backyard wood pergola and outdoor seating area

Gazebos & Pergolas

Open or partially open structures whose permit treatment depends on design, size, attachment and the municipality’s rules.

Accessory structure permits for a modern detached backyard building

Other Detached Structures

Custom backyard buildings and similar structures that serve the main residential property but do not fit a standard category.

When a Permit May Be Required

Three Questions That Change Accessory Structure Permits

Accessory structure permits are project-specific. These are useful screening questions before drawings are developed.

Question 01

What Type of Structure Is It?

A qualifying storage shed can use the specific 15 m² exemption. Other accessory buildings should not be assumed to receive the same exemption.

Question 02

Is It Attached or Serviced?

Attachment to another building or plumbing can require a building permit regardless of floor area. The final design must be reviewed before relying on an exemption.

Question 03

Does It Meet Local Zoning?

Municipal zoning can regulate location, setbacks, height and lot coverage even when a building permit is not required.

What Is Included

Permit Drawings That Show the Structure and Its Relationship to the Property

The exact submission package depends on the municipality and structure. A typical accessory-building permit package can include the following information.

Site Plan

Property lines, existing buildings, proposed structure location, setbacks, easements and other site conditions relevant to the application.

Floor Plan

Overall dimensions, openings, proposed use and construction information required to understand the layout.

Exterior Elevations

Wall heights, roof form, exterior openings, grade relationship and other visible dimensions.

Building Sections

Foundation, floor, wall and roof relationships shown through the structure where required.

Construction Details

Typical assemblies and structural details necessary for municipal review of the proposed construction.

Supporting Coordination

Resources & Guidance, tree information or other supporting documents coordinated when required and included in the project scope.

Planning Considerations

What Should Be Checked Before You Choose the Final Location?

The backyard may look open, but the buildable area can be affected by several property-specific constraints.

Accessory structure zoning and permit setback for a backyard shed

Setbacks

Required distances from rear and side property lines can determine where the structure may be placed.

Detached garage and landscaped yard illustrating lot coverage

Lot Coverage

The proposed footprint may count toward accessory-building or overall lot-coverage limits under the local zoning by-law.

Accessory structure permit height review for a detached garage

Height

Municipal zoning can regulate the permitted height of detached accessory buildings and structures.

Detached garage separated from the main house

Distance to the House

Separation from the main dwelling or other structures can affect zoning, construction details and fire-related design considerations.

Accessory structure near mature trees and property features

Trees & Easements

Existing trees, easements and utilities can restrict the practical location even when the yard appears large enough.

Modern detached garage and workshop used for parking and servicing

Use & Servicing

Storage, vehicle parking, plumbing and other intended uses can change the permit and design requirements.

Our Process

From Backyard Idea to Permit-Ready Accessory Structure

We keep the site, zoning and building drawings connected so the permit package reflects the project being proposed.

Project Review

Confirm the type, size, use and preferred location.

Site Information

Review survey, dimensions and existing property conditions.

Zoning Check

Identify applicable location, height and coverage constraints.

Drawing Package

Prepare the coordinated plans and construction details.

Submission

Organize the municipality’s current application requirements.

Review Support

Address relevant drawing comments within the agreed scope.

Why Building Permit Group

A Small Structure Still Deserves a Complete Site and Permit Review.

Accessory buildings often sit close to property lines, trees, driveways or neighbouring structures. Good planning starts with the property, not a generic shed plan.

Property-Based Drawings

The proposed structure is located and dimensioned against the actual site information available for the property.

Permit vs. Zoning Kept Separate

We distinguish the Building Code permit question from municipal zoning compliance instead of treating them as the same approval.

Municipality-Specific Preparation

Current submission requirements are checked for the municipality reviewing the project.

No Approval Promises

We provide coordinated documentation and practical guidance without claiming that a municipality will approve a proposal.

Municipal Coverage

Accessory Structure Requirements Vary Across the GTA

Where you live matters. Zoning standards, permit submission requirements and property constraints can differ by municipality and project. We review the applicable local requirements before preparing the permit drawing package.

TorontoEtobicokeNorth YorkScarborough MississaugaBramptonVaughanMarkham Richmond HillOakvilleBurlingtonMilton
Why the location check matters: Toronto is one example of how permit rules can distinguish between a qualifying storage shed and other accessory structures. The City states that sheds under 15 m² can be permit-exempt when the exemption conditions are met, while other accessory structures larger than 10 m² generally require a building permit. Local zoning still applies. For official information, review the City of Toronto permit guidance and Ontario Building Code information.
Related Residential Services

Services That Can Connect to an Accessory Structure Project

A detached structure can involve more than one approval or design discipline. These related services cover common next steps.

Before You Build

Confirm the Permit and Zoning Path Before You Place the Structure.

Send the property address, proposed size, intended use and preferred location. We can review the project context and identify the drawing and approval steps that should come next.

Discuss My Accessory Structure
Accessory structure permit project for a detached residential garage and driveway
Homeowner Questions

Accessory Structure Permit FAQ

These answers provide general guidance. The municipality and the final design determine which permit, zoning and supporting requirements apply.

Do I need a building permit for a shed in Ontario?
A shed can be exempt from a building permit when it meets the Ontario Building Code exemption criteria, including size, height, attachment, use and plumbing conditions. Zoning requirements can still apply even when a permit is not required.
What is the 15 m² shed exemption?
Ontario’s Building Code provides an exemption for a shed not more than 15 m² in gross area when it is one storey, detached, used only for storage ancillary to a principal building and has no plumbing.
Does every accessory structure under 15 m² avoid a permit?
No. The 15 m² exemption is specific to a qualifying storage shed. Toronto, for example, requires a permit for other accessory structures larger than 10 m².
Can zoning rules apply even when no building permit is required?
Yes. Municipal zoning can still regulate location, setbacks, height, lot coverage and other property-specific standards when a Building Code permit exemption applies.
What drawings are commonly needed for an accessory structure permit?
Requirements vary by municipality and project. A typical package can include a site plan, floor plan, elevations, sections, construction details and dimensions showing the structure’s relationship to property lines and other buildings.
Do detached garages need permits?
They often do. Toronto currently requires a permit for an accessory structure larger than 10 m², including a detached garage. Other municipalities should be checked separately.
What if my accessory structure does not meet the zoning by-law?
The design may need revision, or the homeowner may need site-specific zoning relief. Minor variance review may be appropriate when the proposal cannot meet a zoning standard.
Can I build an accessory structure in a side yard?
That depends on the municipal zoning by-law and the property’s zoning. Some municipalities restrict accessory structures to specific yards or impose different setbacks based on location.
Do trees or easements affect where I can build?
They can. A site plan should identify relevant easements, property boundaries and existing conditions. Municipal tree protection or other approvals may also affect the proposed location.
Does a cabana or pool house need a permit?
It can. Permit requirements depend on the size, design, plumbing, attachment and other project features. Pool-related structures can also be subject to separate municipal rules.
Can an accessory building contain plumbing?
Yes, but plumbing changes the permit analysis. A structure with plumbing generally requires a building permit even when a small detached structure without plumbing might otherwise be exempt.
Is a pergola treated the same as a shed?
Not necessarily. Municipal definitions and Building Code requirements depend on the structure’s design and use. A pergola, gazebo, shed and detached garage should not be assumed to follow identical rules.
Can Building Permit Group prepare drawings for an existing unpermitted structure?
We can review the available property information and existing structure to determine what drawings and next steps may be appropriate. Municipal requirements for existing work vary by location and circumstances.
How long does an accessory structure permit take?
Review times depend on the municipality, application completeness and project complexity. We do not use a universal timeline because municipal processing and requests for additional information can vary.
Can you guarantee permit approval?
No. The municipality is the approval authority. Our role is to prepare coordinated drawings and application information within the agreed scope and respond to relevant drawing comments.